Have a gander at Barbara riding the future walk- and cycleway on the old off-ramp – and listen to NZTA and AT as they prepare to do their best to have the off-ramp open (together with a protected cycleway on Nelson Street itself) within the next 6 months!
Nelson Street pilot project on TV!
1 min read